| Owner |
: JORDAN PHOSPATE COMPANY |
| Contractor |
: El Concorde Construction |
| Project |
: AQABA MAIN PORT PHOSPATE TERMINAL |
| Date |
: November 2008 |
| Responsible Engineer |
: Eng Ala'a Allawe |
|
| |
RI scope in this project includes:
1- Supply of L.V MDB panel, Main circuit breaker 2000A ACB Mitsubishi Electric.
2- Supply of 2No. Motor control centers to drive 5No. filters. Each filter consists of a soft-starter 90KW ventilator, screw conveyer and control valves. The whole process is monitored by 2No. HMI touch screen (GOT1000 Mitsubishi) and controlled by A-series PLC also from Mitsubishi electric. |
|
| |
| |
| Owner |
: Water Authority of Jordan (WAJ) |
| Contractor |
: El Concorde Construction |
| Project |
: Jerash Waste Water Treatment Project |
| Date |
: May 2008 |
| Responsible Engineer |
: Eng Ala'a Allawe |
|
|
| |
|
RI scope in this project includes:
1- Supply of full functional tested L.V electrical panels from the low tension main switchboard down to the smallest final distribution board for lighting and socket. Main distribution switchboard, and Motor control centers MCCs were constructed according to FORM-4 type of separation to ensure the highest safety for the operators. All main parts, including air circuit breakers ACBs, Molded case circuit breakers MCCBs, Contactors and Protection Devises were Mitsubishi Electric – Japan products assembled inside IP54 Areta- Italy enclosures according to the highest standards.
2- Supply of the control system: PLC panels, RTUs and communication system were assembled and tested to ensure the highest quality, reliability and safe operation of the field. The system comprises 6 PLC RTUs controls and monitors up to 4,000.00 Tags (digital and analogue).
3- Supply, installation and commissioning of SCADA system to monitor, control and supervise the whole plant from the control room. 4,000.00 Tags (digital and analogue) are under total control by Citect SCADA system. |
|
|
| |
| |
| Owner |
: Shdefat slaughterhouse |
| Contractor |
: Alpha Refrigeration & Air Conditioning Est. |
| Project |
: Cold Stores |
| Date |
: January 2008 |
| Responsible Engineer |
: Eng. Husni Sultan |
|
|
| |
|
RI scope in this project includes:
1- Supply of Main Distribution Board with 1600A main air circuit breaker and branch MCCB circuit breakers.
2- Supply of Sub-main distribution boards.
3- MCC panels where compressors, evaporators fan and electrical defrost heater starters are assembled in accordance with the requirements of the project. |
|
|
| |
| |
| Owner |
: Water Authority of Jordan WAJ |
| Contractor |
: Quality & Excellence Contracting. |
| Project |
: Ein Aldeek Pump Station |
| Date |
: April 2008 |
| Responsible Engineer |
: Eng. Abd Alsalam Shonar |
|
| |
More than 100 I/Os are monitored and controlled through A-series PLC from Mitsubishi electric.
Signals from and to MDB, ATS, UPS, instrumentation and two 135KW soft starter were driven and monitored through the PLC system.
Two PLC stations were connected together by a communication bus and each station has its own touch panel HMI from Mitsubishi electric.
|
|
| |
| |
| Owner |
: Public Security Directorate |
| Contractor |
: Aqua Treat |
| Project |
: Um Allolo Water Treatment Station |
| Date |
: February 2008 |
| Responsible Engineer |
: Eng. Rula Thwabeh |
|
| |
RI scope in this project includes:
Motor Control Center electrical panel was interfaced with PLC (Mitsubishi FX2NC) in order to control motors, valves and other actuators according to level and flow transmitter signals.
Control system was equipped with GSM modem to send critical data and alarms to the responsible operator. |
|
| |
| |
| Owner |
: Jordan Poultry for Process & Marketing Co. (JPPC) |
| Project |
: New Production Line |
| Date |
: May 2008 |
| Responsible Engineer |
: Eng. Mohammad Alqorah |
|
| |
Distribution: Main Distribution Board consists of two 2500A ACB interlocked with 2500A bus-coupler and distribution breakers.
Control: Motor control center MCC consists of DOL, Star-Delta and autotransformer starters for different types of motors. All starters were interfaced with PLC.
500 I/Os were monitored and controlled through different stages of production line by A-series PLC from Mitsubishi electric.
SCADA: the whole system is monitored, controlled and reported by a personal computer with Citect SCADA software |
|
| |
| |
| Owner |
: Hammoudeh Food Industries Co. Ltd. |
| Contractor |
: Alpha Refrigeration & Air Conditioning Est. |
| Project |
: Cold Stores |
| Date |
: January 2008 |
| Responsible Engineer |
: Eng. Husni Sultan |
|
| |
Compressors, evaporator fans and electrical defrost heaters MCC panels were assembled in accordance with the requirements of the project.
All starters (including 5No. 350 KW compressors) were interfaced and controlled to achieve the control sequence with high reliability and accuracy. |
|
| |
| |
| Owner |
: International Airport Group (Queen Alia International Airport) |
| Project |
: Air Traffic Tower Automatic Transfer Switch 1250A |
| Date |
: February 2008 |
| Responsible Engineer |
: Eng. Duraid Khrais |
|
|
| |
|
Automatic Transfer Switch between two generators was supplied, installed, programmed and commissioned within the highest standards taken into regards the critical load connected to this ATS.
The ATS was interfaced with computerized monitoring system to generate alarms in emergency situations and report faults to operators and engineers. |
|
|
| |
| |
| Owner |
: Civil Aviation Authority (Queen Alia International Airport) |
| Project |
: Electrical System Upgrade and power SCADA system |
| Date |
: May 2007 |
| Responsible Engineer |
: Eng. A’ahed Salah |
|
|
| |
|
26 old air circuit breakers (ACB) were replaced with new up to date technology (4000,3000,2500,1250A ACB) (Type Merlin-Gerin, Schneider Electric).
This project was performed under the RETROFIT conditions where the new ACBs were modified to replace the old ACBs without any Busbar fabrication on site and within few hours for each ACB. The RETROFIT conditions are designed according to the highest standards and under the supervision of Schneider electric – France.
All of these ACBs were connected through MODBUS to a SCADA system in order to achieve the maximum performance to the system, where the power system will be monitored and controlled from local station and through the internet.
All data will be reported and analyzed through the software. (SMS software from Schneider Electric) |
|
|
| |
| |
| Owner |
: Civil Aviation Authority (Queen Alia International Airport) |
| Project |
: Electrical System Upgrade for Cargo building |
| Date |
: February 2007 |
| Responsible Engineer |
: Eng. Johl Al_laham |
|
| |
7 old air circuit breakers (ACB) were replaced with new up to date technology (3000, 2500, 1250A ACB) (Type Merlin-Gerin, Schneider Electric).
This project was performed under the RETROFIT conditions where the new ACBs were modified to replace the old ACBs without any Busbar fabrication on site and within few hours for each ACB.
The RETROFIT conditions are designed according to the highest standards and under the supervision of Schneider electric – France. |
|
| |
| |
| Owner |
: Arab Potash Company (APC) |
| Project |
: Alsafi Salt Factory (PLC control system and SCADA |
| Date |
: March 2007 |
| Responsible Engineer |
: Eng Bashar Alz’obi |
|
| |
Upgrade the control system from Siemens S5 PLC to Siemens S7-400 PLC, the job includes the installation of new PLCs, programming and commissioning.
New SCADA system was programmed to supervise and control the plant.
All starters ( MCC ) controlled through PROFIBUS network. |
|
| |
| |
| Owner |
: National Hatchery Company |
| Project |
: 60 Hatcheries Control system (SCADA) |
| Date |
: March 2006 |
| Responsible Engineer |
: Eng. Emad odeh |
|
| |
60 Hatchery control and SCADA system
No. of I/O : 1920 I/O
Signals Type : System pressure, temperature and digital signals.
60 hatcheries was equipped with a 32 I/O FX type PLC (Mitsubishi), analogue input, communication module and touch screen in order to control the heating, cooling, ventilating and to communicate with the main computer station where the whole system monitoring, alarming and reporting is performed.
SCADA interface : 60 touch screen (Mitsubishi) and PC for main station
PLC type : Mitsubishi (FX series)
SCADA SW : MX4 (Mitsubishi)
Also, an MCC panel was designed, assembled and wired for each hatchery.
|
|
| |
| |
| Owner |
: Hammoudeh Food Industries Co. Ltd. |
| Project |
: Electrical Panels |
| Date |
: January 2006 |
| Responsible Engineer |
: Eng Abd-assalam Abu-a’ael |
|
| |
Manufacturing and assembling the following electrical panels:
1- MDB with 2500A main incomer (ACB type Merlin-Gerin, Schneider Electric)
2- SMDB’s (FORM-2) (MCCB’s type Merlin-Gerin, Schneider Electric)
3- Automatic Transfer switch (ATS) 400A (Telemecanique, Schneider Electric)
4- Motor control center (MCCs) (Telemecanique, Schneider Electric) |
|
| |
| |
| Owner |
: Hammoudeh Food Industries Co. Ltd. |
| Project |
: Electrical Panels |
| Date |
: July 2006 |
| Responsible Engineer |
: Eng Emad Odeh |
|
| |
Manufacturing and assembling 15 MCC panel.
Starter’s type : DOL, YD and soft-starters (Telemecanique)
Speed control : Variable Frequency Drives (Mitsubishi electric) |
|
| |
| |
| Owner |
: Civil Aviation Authority (Queen Alia International Airport) |
| Project |
: Water Network Wireless SCADA system |
| Date |
: May 2006 |
| Responsible Engineer |
: Eng. Na’el Honaiti |
|
|
| |
|
Water Network SCADA system (Wireless)
No. of I/O : 400 I/O
10 PLC stations with a Wireless modem for each station was designed, assembled and programmed to send data and receive commands between the water network (tanks, pumps and wells) and two computer stations.
Regarding to the wide distances between the water network components; the communication between the computers and the water network was established through wireless network.
SCADA interface : Two PCs as main stations
PLC type : Mitsubishi (FX series)
SCADA SW : Citect (MX4 Mitsubishi) |
|
|
| |
| |
| Owner |
: Jordan Feed Company |
| Project |
: Automatic Dosing and Batching System |
| Date |
: April 2005 |
| Responsible Engineer |
: Eng Abd-assalam Abu-a’ael |
|
| |
This Project scope includes:
- Building a new control room
- Installation of a new instrumentation and cables
- Switching from old traditional control room to the new one during 48 hours.
Mitsubishi Electric PLC and SCADA system were used to achieve first class safe, reliable, accurate and flexible control system.
PLC connected to the weight indicators, motors variable frequency drives VFD, instrumentations (Level transmitters, pressure transmitter …) and motor protection relays by PROFIBUS network.
Up to 1200 variable were monitored and controlled by this SCADA system. |
|
| |
| |
| Owner |
: Nabeel Food Industries |
| Project |
: Electrical Panels |
| Date |
: April 2005 |
| Responsible Engineer |
: Eng Ahmad Al-tarifi |
|
| |
Electrical panels additions, modifications and upgrade was performed in this project, as the following:
1- New SMDB was added to the system (Type Merlin-Gerin, Schneider Electric)
2- MDB upgrade including the upgrade the Incomer from 1600A to 2500A
3- Upgrade all the SMDBs to meet the new electrical conditions. |
|
| |
| |
| Owner |
: Al-Hekmah Pharmaceutical Industries |
| Project |
: Vacuum Coating Machine (Control and SCADA system) |
| Date |
: August 2004 |
| Responsible Engineer |
: Eng. Shereen horani |
|
| |
No. of I/Os : 600 I/O
Signals type : System pressure, temperature, speed control (VFD) and digital signals.
SCADA interface : 15” industrial PC screen
PLC type : Siemens
SCADA SW : WinCC Siemens |
|
| |
| |